FIR – ACE-T11 (Flight Ops)

When:
December 18, 2020 @ 5:00 am – 5:00 pm
2020-12-18T05:00:00-05:00
2020-12-18T17:00:00-05:00
Contact:
Amber Krauss

Kate Rubins removes ACE-T11 ACE Module S/N 2017 and then installs ACE-TR-2 (Ellipsoids) Module S/N R002.

Powered science operations for ACE-TR-2 (Ellipsoids) Module S/N R002, Days 1-6 or 25.