February 1, 2017

GIPOC Home

Nov
2
Mon
2020
FIR – FBCE (Ground Ops)
Nov 2 @ 8:00 am – 4:00 pm

FBCE Integration Into GIU:
*Crane Lift Procedure (FBCE-PRO-186)
*FBCE Integration Procedure (FBCE-PRO-145)
*FBCE Installation Procedure (FBCE-PROP-001)

SAMS – CU (Flight Ops)
Nov 2 @ 10:00 am – 11:00 am
Nov
3
Tue
2020
MSG – Drop Vibration (Flight ops)
Nov 3 @ 5:50 am – 2:00 pm

Kate Rubins operates the Drop Vibration experiment in MSG.

FIR – FBCE (Ground Ops)
Nov 3 @ 8:00 am – 4:00 pm

FBCE Integration Into GIU:
*Crane Lift Procedure (FBCE-PRO-186)
*FBCE Integration Procedure (FBCE-PRO-145)
*FBCE Installation Procedure (FBCE-PROP-001)

Nov
4
Wed
2020
FIR – FBCE (Ground Ops)
Nov 4 @ 8:00 am – 4:00 pm

Validate PRCU and FBCE Activation and Shutdown (UID 713)
*PRCU/FBCE Start-up/Shut-Down (FIR-OPS-2055)
*FIR/FBCE Start-up/Shut-Down (FIR-OPS-2054)

Nov
5
Thu
2020
Orion ESR (Simulation)
Nov 5 all-day
Orion – ESR (Simulation)
Nov 5 @ 6:00 am – 8:00 pm
MSG – Drop Vibration (Flight ops)
Nov 5 @ 6:25 am – 1:00 pm

Kate Rubins operates the Drop Vibration experiment in MSG.

FIR – FBCE (Ground Ops)
Nov 5 @ 8:00 am – 4:00 pm

Validate PRCU.
FBCE Activation and Shutdown.
Tuning Water Flow.
(UID 713)

*PRCU/FBCE Start-up/Shut-Down (FIR-OPS-2055)
*FIR/FBCE Start-up/Shut-Down (FIR-OPS-2054)

Nov
6
Fri
2020
FIR – FBCE (Ground Ops)
Nov 6 @ 8:00 am – 4:00 pm

Validate PRCU.
FBCE Activation and Shutdown.
Tuning Water Flow.
(UID 713)

*PRCU/FBCE Start-up/Shut-Down (FIR-OPS-2055)
*FIR/FBCE Start-up/Shut-Down (FIR-OPS-2054)