February 1, 2017

GIPOC Home

Sun Mon Tue Wed Thu Fri Sat
1
FIR – ACE-TR-1 (Flight Ops) 7:30 am
FIR – ACE-TR-1 (Flight Ops)
Oct 1 @ 7:30 am – 7:00 pm
ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Days 9-13 of 24.
CIR – BRE-2 (Flight Ops) 10:21 pm
CIR – BRE-2 (Flight Ops)
Oct 1 @ 10:21 pm – Oct 2 @ 12:00 am
Perform ACME BRE Test Points with 100% methane (Day 3 of 8).
2
Orion – ESR (Simulation) 6:00 am
Orion – ESR (Simulation)
Oct 2 @ 6:00 am – 8:00 pm
 
FIR – ACE-TR-1 (Flight Ops) 7:30 am
FIR – ACE-TR-1 (Flight Ops)
Oct 2 @ 7:30 am – 7:00 pm
ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Days 9-13 of 24.
CIR – BRE-2 (Flight Ops) 8:30 am
CIR – BRE-2 (Flight Ops)
Oct 2 @ 8:30 am – 8:30 pm
Transfer & Downlink Image Files.
3
FIR – ACE-TR-1 (Flight Ops) 7:30 am
FIR – ACE-TR-1 (Flight Ops)
Oct 3 @ 7:30 am – 7:00 pm
ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Days 9-13 of 24.
4
FIR – ACE-TR-1 (Flight Ops) 7:30 am
FIR – ACE-TR-1 (Flight Ops)
Oct 4 @ 7:30 am – 7:00 pm
ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Days 9-13 of 24.
5
FIR – ACE-TR-1 (Flight Ops) 8:00 am
FIR – ACE-TR-1 (Flight Ops)
Oct 5 @ 8:00 am – 7:30 pm
ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Days 14-20 of 24
CIR – BRE-2 (Flight Ops) 9:00 am
CIR – BRE-2 (Flight Ops)
Oct 5 @ 9:00 am – Oct 6 @ 1:00 am
Perform ACME BRE Test Points with 100% methane – Test Day 3 (Day 3 of 8)
SAMS – CU (Flight Ops) 11:00 am
SAMS – CU (Flight Ops)
Oct 5 @ 11:00 am – 12:00 pm
 
6
7
CIR – BRE-2 (Flight Ops) 6:45 am
CIR – BRE-2 (Flight Ops)
Oct 7 @ 6:45 am – 6:45 pm
Transfer & Downlink Image Files
FIR – ACE-TR-1 (Flight Ops) 8:00 am
FIR – ACE-TR-1 (Flight Ops)
Oct 7 @ 8:00 am – 7:30 pm
ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Days 14-20 of 24
8
9
FIR – ACE-TR-1 (Flight Ops) 8:00 am
FIR – ACE-TR-1 (Flight Ops)
Oct 9 @ 8:00 am – 7:30 pm
ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Days 14-20 of 24
10
11
FIR – ACE-TR-1 (Flight Ops) 8:00 am
FIR – ACE-TR-1 (Flight Ops)
Oct 11 @ 8:00 am – 7:30 pm
ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Days 14-20 of 24
13
FIR – ACE-TR-1 (Flight Ops) 8:00 am
FIR – ACE-TR-1 (Flight Ops)
Oct 13 @ 8:00 am – Oct 14 @ 5:30 am
ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Days 21&22 of 24. ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Days 23&24 of 24.
14
CIR – BRE-2 (Flight Ops) 10:15 am
CIR – BRE-2 (Flight Ops)
Oct 14 @ 10:15 am – 5:45 pm
Perform File Updates on IPSUG, Perform File Maintenance
15
Orion – ESR (Simulation) 6:00 am
Orion – ESR (Simulation)
Oct 15 @ 6:00 am – 8:00 pm
 
CIR – ACME (GIU Ops) 8:00 am
CIR – ACME (GIU Ops)
Oct 15 @ 8:00 am – 4:00 pm
 
FIR – ACE-TR-1 (Flight Ops) 8:00 am
FIR – ACE-TR-1 (Flight Ops)
Oct 15 @ 8:00 am – Oct 16 @ 5:30 am
ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Days 21&22 of 24. ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Days 23&24 of 24.
16
17
18
20
21
22
23
25
27
Orion – ESR (Simulation) 6:00 am
Orion – ESR (Simulation)
Oct 27 @ 6:00 am – 8:00 pm
 
FIR – ACE-TR (Flight ops) 8:00 am
FIR – ACE-TR (Flight ops)
Oct 27 @ 8:00 am – Oct 28 @ 5:30 am
ACE-TR-1 (Ellipsoids) Module S/N R001 powered science operations, Bonus Day 3.
28
FCF GIU Integration 8:00 am
FCF GIU Integration
Oct 28 @ 8:00 am – 4:00 pm
Install 67213EFAF30021 cable to FIR GIU (FBCE) Perform cable checkout (FBCE) Perform Rack & Science WFCA valve set to full open (FBCE) Perform CIR Pumps Functional and airflow testing
29
FIR – ACE-TR (Flight ops) 8:00 am
FIR – ACE-TR (Flight ops)
Oct 29 @ 8:00 am – 2:30 pm
Perform File Updates on IPSUG, Perform File Maintenance
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Oct 29 @ 8:00 am – 4:00 pm
FBCE Integration Into GIU: *Crane Lift Procedure (FBCE-PRO-186) *FBCE Integration Procedure (FBCE-PRO-145) *FBCE Installation Procedure (FBCE-PROP-001)
MSG – Drop Vibration (Flight ops) 11:15 am
MSG – Drop Vibration (Flight ops)
Oct 29 @ 11:15 am – 2:15 pm
Kate Rubins installs Drop Vibration hardware in MSG.
30
Orion – ESR (Simulation) 6:00 am
Orion – ESR (Simulation)
Oct 30 @ 6:00 am – 8:00 pm
 
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Oct 30 @ 8:00 am – 4:00 pm
FBCE Integration Into GIU: *Crane Lift Procedure (FBCE-PRO-186) *FBCE Integration Procedure (FBCE-PRO-145) *FBCE Installation Procedure (FBCE-PROP-001)
31