February 1, 2017

GIPOC Home

Sun Mon Tue Wed Thu Fri Sat
1
2
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 2 @ 8:00 am – 4:00 pm
FBCE Integration Into GIU: *Crane Lift Procedure (FBCE-PRO-186) *FBCE Integration Procedure (FBCE-PRO-145) *FBCE Installation Procedure (FBCE-PROP-001)
SAMS – CU (Flight Ops) 10:00 am
SAMS – CU (Flight Ops)
Nov 2 @ 10:00 am – 11:00 am
 
3
MSG – Drop Vibration (Flight ops) 5:50 am
MSG – Drop Vibration (Flight ops)
Nov 3 @ 5:50 am – 2:00 pm
Kate Rubins operates the Drop Vibration experiment in MSG.
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 3 @ 8:00 am – 4:00 pm
FBCE Integration Into GIU: *Crane Lift Procedure (FBCE-PRO-186) *FBCE Integration Procedure (FBCE-PRO-145) *FBCE Installation Procedure (FBCE-PROP-001)
4
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 4 @ 8:00 am – 4:00 pm
Validate PRCU and FBCE Activation and Shutdown (UID 713) *PRCU/FBCE Start-up/Shut-Down (FIR-OPS-2055) *FIR/FBCE Start-up/Shut-Down (FIR-OPS-2054)
5
Orion ESR (Simulation)
Orion – ESR (Simulation) 6:00 am
Orion – ESR (Simulation)
Nov 5 @ 6:00 am – 8:00 pm
 
MSG – Drop Vibration (Flight ops) 6:25 am
MSG – Drop Vibration (Flight ops)
Nov 5 @ 6:25 am – 1:00 pm
Kate Rubins operates the Drop Vibration experiment in MSG.
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 5 @ 8:00 am – 4:00 pm
Validate PRCU. FBCE Activation and Shutdown. Tuning Water Flow. (UID 713) *PRCU/FBCE Start-up/Shut-Down (FIR-OPS-2055) *FIR/FBCE Start-up/Shut-Down (FIR-OPS-2054)
6
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 6 @ 8:00 am – 4:00 pm
Validate PRCU. FBCE Activation and Shutdown. Tuning Water Flow. (UID 713) *PRCU/FBCE Start-up/Shut-Down (FIR-OPS-2055) *FIR/FBCE Start-up/Shut-Down (FIR-OPS-2054)
7
8
9
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 9 @ 8:00 am – 4:00 pm
FBCE System Checkout Procedure FBCE-PRO-271 Need IPSU-CL LiveView displays and analog camera displays in addition to FCF and FBCE TADS
HemoCue Voice Training (Ground) 8:00 am
HemoCue Voice Training (Ground)
Nov 9 @ 8:00 am – 3:00 pm
 
SAMS – CU (Flight Ops) 10:00 am
SAMS – CU (Flight Ops)
Nov 9 @ 10:00 am – 11:00 am
 
10
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 10 @ 8:00 am – 4:00 pm
FBCE System Checkout Procedure FBCE-PRO-271 Need IPSU-CL LiveView displays and analog camera displays in addition to FCF and FBCE TADS
11
12
Orion ESR (Simulation)
Orion – ESR (Simulation) 6:00 am
Orion – ESR (Simulation)
Nov 12 @ 6:00 am – 8:00 pm
 
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 12 @ 8:00 am – 4:00 pm
FBCE System Checkout Procedure FBCE-PRO-271 Need IPSU-CL LiveView displays and analog camera displays in addition to FCF and FBCE TADS   FBCE Qualified Operator Training Day 1 of 3
13
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 13 @ 8:00 am – 4:00 pm
FBCE Qualified Operator Training Day 2 of 3
14
15
16
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 16 @ 8:00 am – 4:00 pm
IOP Registry/ Software Test Thingy IOP Registry Software Validation FCF-TST-4619 “  IOP MP Software Verification for Flow Boiling and Condensation Experiment (FBCE)” (FCF-SWO-0333)
CIR – CFI-G (Ground Ops) 9:00 am
CIR – CFI-G (Ground Ops)
Nov 16 @ 9:00 am – 4:00 pm
ACME CFI-G Script Development
SAMS – CU (Flight Ops) 10:00 am
SAMS – CU (Flight Ops)
Nov 16 @ 10:00 am – 11:00 am
 
18
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 18 @ 8:00 am – 4:00 pm
Electrical Verification
19
MSG – Drop Vibration (Flight Ops) 2:00 am
MSG – Drop Vibration (Flight Ops)
Nov 19 @ 2:00 am – 2:00 pm
Mike Hopkins operates the Drop Vibration experiment in MSG.
CIR (Ground Ops) 8:00 am
CIR (Ground Ops)
Nov 19 @ 8:00 am – 4:00 pm
Pump Install
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 19 @ 8:00 am – 4:00 pm
V&V Testing General FBCE tasks include power up and telemetry and camera checks/review. Need IPSU-CL LiveView displays and analog camera displays in addition to FCF and FBCE TADS
20
FIR – ACE-T11 (Flight Ops) 9:00 am
FIR – ACE-T11 (Flight Ops)
Nov 20 @ 9:00 am – Nov 25 @ 7:00 pm
Victor Glover configures LMM for ACE-T11 operations, installs ACE Module S/N 2017   Powered science operations for ACE-T11 ACE Module S/N 2017
Orion ESR (Simulation)
APM (Flight Ops) 3:00 am
APM (Flight Ops)
Nov 20 @ 3:00 am – 4:00 pm
Airborne Particulate Monitor Node 3 Install Crew installs the Airborne Particulate Monitor Hardware in Node 3 and takes pictures.
CIR (Ground Ops) 8:00 am
CIR (Ground Ops)
Nov 20 @ 8:00 am – 4:00 pm
Pump Checkout
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 20 @ 8:00 am – 4:00 pm
V&V Testing TBD General FBCE tasks include power up, finish telemetry and camera function checks, then moving to built-in tests. Need IPSU-CL LiveView displays and analog camera displays in addition to FCF and FBCE TADS. Read more about FIR – FBCE (Ground Ops)[…]
21
22
23
MSG – Drop Vibration (Flight Ops) 2:00 am
MSG – Drop Vibration (Flight Ops)
Nov 23 @ 2:00 am – 3:00 pm
Victor Glover operates the Drop Vibration experiment in MSG. Kate Rubins operates the Drop Vibration experiment in MSG. Soichi Noguchi operates the Drop Vibration experiment in MSG. Kate Rubins operates the Drop Vibration experiment in Read more about MSG – Drop Vibration (Flight Ops)[…]
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 23 @ 8:00 am – 6:00 pm
Data Management. General FBCE tasks include power up, finish telemetry and camera function checks, then moving to built-in tests.
CIR – CFI-G (Ground Ops) 9:00 am
CIR – CFI-G (Ground Ops)
Nov 23 @ 9:00 am – 4:00 pm
ACME CFI-G Script Development
SAMS – CU (Flight Ops) 10:00 am
SAMS – CU (Flight Ops)
Nov 23 @ 10:00 am – 11:00 am
 
24
MSG – Drop Vibration (Flight Ops) 2:00 am
MSG – Drop Vibration (Flight Ops)
Nov 24 @ 2:00 am – 3:00 pm
Victor Glover operates the Drop Vibration experiment in MSG. Kate Rubins operates the Drop Vibration experiment in MSG. Soichi Noguchi operates the Drop Vibration experiment in MSG. Kate Rubins operates the Drop Vibration experiment in Read more about MSG – Drop Vibration (Flight Ops)[…]
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 24 @ 8:00 am – 6:00 pm
V&V Testing (TSC) General FBCE tasks include power up, finish telemetry and camera function checks, then moving to built-in tests.
25
MSG – Drop Vibration (Flight Ops) 2:00 am
MSG – Drop Vibration (Flight Ops)
Nov 25 @ 2:00 am – 3:00 pm
Victor Glover operates the Drop Vibration experiment in MSG. Kate Rubins operates the Drop Vibration experiment in MSG. Soichi Noguchi operates the Drop Vibration experiment in MSG. Kate Rubins operates the Drop Vibration experiment in Read more about MSG – Drop Vibration (Flight Ops)[…]
26
27
MSG – Drop Vibration (Flight Ops) 2:00 am
MSG – Drop Vibration (Flight Ops)
Nov 27 @ 2:00 am – 3:00 pm
Victor Glover operates the Drop Vibration experiment in MSG. Kate Rubins operates the Drop Vibration experiment in MSG. Soichi Noguchi operates the Drop Vibration experiment in MSG. Kate Rubins operates the Drop Vibration experiment in Read more about MSG – Drop Vibration (Flight Ops)[…]
APM (Flight Ops) 3:00 am
APM (Flight Ops)
Nov 27 @ 3:00 am – 4:00 pm
Airborne Particulate Monitor Node 3 Install Crew installs the Airborne Particulate Monitor Hardware in Node 3 and takes pictures.
28
29
30
FIR – ACE-T11 (Flight Ops) 8:00 am
FIR – ACE-T11 (Flight Ops)
Nov 30 @ 8:00 am – Dec 2 @ 5:30 pm
Powered science operations for ACE-T11 ACE Module S/N 2017, Days 10-12 of 25.
Orion ESR (Simulation)
MSG – Drop Vibration (Flight Ops) 5:00 am
MSG – Drop Vibration (Flight Ops)
Nov 30 @ 5:00 am – 1:00 pm
Mike Hopkins operates the Drop Vibration experiment in MSG. Mike Hopkins stows the Drop Vibration hardware.
Orion – ESR (Simulation) 6:00 am
Orion – ESR (Simulation)
Nov 30 @ 6:00 am – 8:00 pm
 
FIR – FBCE (Ground Ops) 8:00 am
FIR – FBCE (Ground Ops)
Nov 30 @ 8:00 am – 5:00 pm
 
SAMS – CU (Flight Ops) 10:00 am
SAMS – CU (Flight Ops)
Nov 30 @ 10:00 am – 11:00 am
 
APM (Flight Ops) 12:25 pm
APM (Flight Ops)
Nov 30 @ 12:25 pm – 1:25 pm
Soichi Noguchi Shannon Walker removes APM from Node 3 and installs in Node 2.