Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
FIR – ACE-TR-2 (Flight Ops)
3:00 pm
FIR – ACE-TR-2 (Flight Ops)
Jan 6 @ 3:00 pm – 8:30 pm
Powered operations for software update and file maintenance.
|
CIR – BRE-2 (Flight Ops)
9:00 am
|
|||||
CIR – BRE-2 (Flight Ops)
7:30 am
CIR – BRE-2 (Flight Ops)
Jan 13 @ 7:30 am – 2:30 pm
Perform FOMA operations to prepare chamber for crew access, Capture images of damaged ACME Fiber Arm
|
APM (Flight Ops)
3:00 am
APM (Flight Ops)
Jan 14 @ 3:00 am – 4:00 am
Mike Hopkins removes APM from Node 3 and installs in the Lab Module.
FIR – ACE-TR-2 (Flight Ops)
7:05 am
FIR – ACE-TR-2 (Flight Ops)
Jan 14 @ 7:05 am – 8:30 am
Kate Rubins configures LMM for ACE-TR-2 operations, installs ACE Module S/N R002.
|
|||||
CIR – BRE-2 (Flight Ops)
3:00 am
CIR – BRE-2 (Flight Ops)
Jan 18 @ 3:00 am – 7:00 am
Victor Glover removes broken ACME fiber and replaces ACME Igniter Tip
SAMS – CU (Flight Ops)
10:00 am
|
FIR – ACE-TR-2 (Flight Ops)
11:00 am
FIR – ACE-TR-2 (Flight Ops)
Jan 19 @ 11:00 am – Jan 26 @ 9:00 am
ACE-TR-2 (Ellipsoids) Module S/N R002 powered science operations, Days 1-8 of 23
Orion ESR (Simulation)
|
|||||
CIR – BRE-2 (Flight ops)
7:00 am
CIR – BRE-2 (Flight ops)
Jan 25 @ 7:00 am – 3:00 pm
Configure ACME Chamber Insert for BRE-2 Test Day 9 7:10 – 7:45 EST (flexible) – Kate Rubins gathers hardware from stowage 9:55 – 10:20 EST (flexible) – Kate Rubins prepares the MWA Work Surface Area Read more about CIR – BRE-2 (Flight ops)[…]
SAMS – CU (Flight Ops)
10:00 am
|
CIR – BRE-2 (Flight ops)
10:00 am
CIR – BRE-2 (Flight ops)
Jan 26 @ 10:00 am – 11:00 am
Perform ACME hardware calibrations, Perform ACME BRE Test Points with 100% ethylene – Test Day 9 (Day 9 of 9)
|
HemoCue (Flight Ops)
2:45 am
CIR – BRE-2 (Flight ops)
6:00 am
CIR – BRE-2 (Flight ops)
Jan 28 @ 6:00 am – Jan 29 @ 1:00 am
Perform ACME hardware calibrations, Perform ACME BRE Test Points with 100% ethylene – Test Day 9 (Day 9 of 9)
|
||||