Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
FIR Bench Reconfiguration
FIR Bench Reconfiguration
Nov 1 all-day
FIR Bench Configuration (9:30 – 10:15 EDT) – Mark Vande Hei gathers hardware for FIR Bench Configuration. (10:15 – 13:35 10:20 – 13:40 EDT) – Mark Vande Hei performs FIR Bench Configuration
SAMS – CU (Flight Ops)
10:00 am
|
CIR Flame Design
CIR Flame Design
Nov 2 all-day
Part 1 of configuring the ACME Chamber Insert for Flame Design 8:10 – 8:50 EDT, flexible – Shane Kimbrough gathers hardware from stowage 10:25 – 10:50 EDT – Shane Kimbrough prepares the MWA Work Surface Read more about CIR Flame Design[…]
FIR Bench Reconfiguration
FIR Bench Reconfiguration
Nov 2 all-day
FIR Bench Configuration cont. (9:35 – 10:20 EDT) – Mark Vande Hei returns hardware from FIR Bench Configuration
|
CIR Flame Design
CIR Flame Design
Nov 3 all-day
Part 2 of configuring the ACME Chamber Insert for Flame Design 4:05 – 4:45 EDT – Mark Vande Hei returns hardware from Part 1 to stowage 4:05 – 5:50 EDT 4:45 – 6:30 EDT – Read more about CIR Flame Design[…]
ORION ESR
|
||||
APM Transfer Data
APM Transfer Data
Nov 11 all-day
Misc – Airborne Particulate Monitor (APM) in the Lab Module (Marit Meyer – Ops Lead) Thursday November 11 (10:30 – 10:45 EST) – Tom Marshburn transfers data from APM for downlink to ground.
|
||||||
APM Data Downlinks
APM Data Downlinks
Nov 19 all-day
Misc – Airborne Particulate Monitor (APM) in the Lab Module (Marit Meyer – Ops Lead) Friday November 19 (3:15 – 3:30 EST) – Matthias Maurer transfers data from APM for downlink to ground.
|
||||||
CIR Flame Design 2
CIR Flame Design 2
Nov 22 all-day
Perform ACME Hardware Calibrations to prepare for Flame Design Test Points
SAMS – CU (Flight Ops)
10:00 am
|
CIR Flame Design 2
CIR Flame Design 2
Nov 24 all-day
Perform File Update on ACME, Perform ACME Flame Design Inverse Flame Test Points – Test Day 1 (Day 1 of 8)
MSG InSPACE-4
|
|||||
