February 1, 2017

GIPOC Home

1 Sun 2 Mon 3 Tue 4 Wed 5 Thu 6 Fri 7 Sat
All-day
Orion ESR (Simulation)
12:00 am
1:00 am
2:00 am
3:00 am
4:00 am
5:00 am
6:00 am
7:00 am
8:00 am
9:00 am
10:00 am
11:00 am
12:00 pm
1:00 pm
2:00 pm
3:00 pm
4:00 pm
5:00 pm
6:00 pm
7:00 pm
8:00 pm
9:00 pm
10:00 pm
11:00 pm
8:00 am FIR – FBCE (Ground Ops)
FIR – FBCE (Ground Ops)
Nov 2 @ 8:00 am – 4:00 pm
FBCE Integration Into GIU: *Crane Lift Procedure (FBCE-PRO-186) *FBCE Integration Procedure (FBCE-PRO-145) *FBCE Installation Procedure (FBCE-PROP-001)
10:00 am SAMS – CU (Flight Ops)
SAMS – CU (Flight Ops)
Nov 2 @ 10:00 am – 11:00 am
 
5:50 am MSG – Drop Vibration (Flight ops)
MSG – Drop Vibration (Flight ops)
Nov 3 @ 5:50 am – 2:00 pm
Kate Rubins operates the Drop Vibration experiment in MSG.
8:00 am FIR – FBCE (Ground Ops)
FIR – FBCE (Ground Ops)
Nov 3 @ 8:00 am – 4:00 pm
FBCE Integration Into GIU: *Crane Lift Procedure (FBCE-PRO-186) *FBCE Integration Procedure (FBCE-PRO-145) *FBCE Installation Procedure (FBCE-PROP-001)
8:00 am FIR – FBCE (Ground Ops)
FIR – FBCE (Ground Ops)
Nov 4 @ 8:00 am – 4:00 pm
Validate PRCU and FBCE Activation and Shutdown (UID 713) *PRCU/FBCE Start-up/Shut-Down (FIR-OPS-2055) *FIR/FBCE Start-up/Shut-Down (FIR-OPS-2054)
6:00 am Orion – ESR (Simulation)
Orion – ESR (Simulation)
Nov 5 @ 6:00 am – 8:00 pm
 
6:25 am MSG – Drop Vibration (Flight ops)
MSG – Drop Vibration (Flight ops)
Nov 5 @ 6:25 am – 1:00 pm
Kate Rubins operates the Drop Vibration experiment in MSG.
8:00 am FIR – FBCE (Ground Ops)
FIR – FBCE (Ground Ops)
Nov 5 @ 8:00 am – 4:00 pm
Validate PRCU. FBCE Activation and Shutdown. Tuning Water Flow. (UID 713) *PRCU/FBCE Start-up/Shut-Down (FIR-OPS-2055) *FIR/FBCE Start-up/Shut-Down (FIR-OPS-2054)
8:00 am FIR – FBCE (Ground Ops)
FIR – FBCE (Ground Ops)
Nov 6 @ 8:00 am – 4:00 pm
Validate PRCU. FBCE Activation and Shutdown. Tuning Water Flow. (UID 713) *PRCU/FBCE Start-up/Shut-Down (FIR-OPS-2055) *FIR/FBCE Start-up/Shut-Down (FIR-OPS-2054)